BAJADA × TGB
MFCC Trade Fair 2026 · Campaign Hub
One Campaign · Every Workstream

The MFCC Campaign,
end to end

Every moving part of the fair in one place. The stand concepts you pick from, the build and print path, the lead capture engine, the on-site days, and the post-fair wrap. This is what we deliver between now and the fair, and who owns each piece.

Alignment callThu 4 June 2026
Fair Day 1Tue 24 June 2026
Stand12m × 6m open island
Deliverables9 workstreams
01 / Why this fair matters

Two big moves, one floor

This is not a normal fair year for Bajada. Two moments land at the same time, in front of a live Maltese audience, in the same space. The stand is where a new product and live grant demand meet. The whole campaign is built so each one carries the other.

Moment One

Water Pro launch

Bottled-quality water on a monthly subscription, in front of the public for the first time. The hero of the stand and the overhead fascia.

Moment Two

PV Grant window

The government PV incentive is driving live demand for Solar, Battery and Heat Pump. The fair turns that demand into booked leads.

02 / The stand

Pick the layout, then we build

Design takes the longest, so the stand comes first. You flagged the worry that the early concept read like cubicles. That is fully fixed. All four options are open islands you walk straight into, hip-height partitions only, and they read from every side with the same Water Pro hero overhead.

Once a layout is chosen, it locks the print artwork, the Water Pro counter zone, the assembly brief, and the vendor handoff. That is why this is the first decision on the call.
03 / What we deliver

Nine workstreams, four phases

Everything we are fulfilling for the fair, grouped by the order it happens. Each line shows what it covers and who owns it. All nine are live and tracked in ClickUp.

Phase A · Design and print
1

Stand design and print-ready artwork

Fascia, back wall, side flags and partitions. Full visual system across the chosen layout, set to print spec.

Designed and managed end to end by TGB
Open
2

Water Pro on-stand zone

Counter wrap, tasting signage and QR panel. The hero product zone where visitors taste, scan and subscribe.

Designed and managed end to end by TGB
Open
4

Sticker vendor handoff

Spec sheet plus final files packaged for the vinyl print and on-stand install. Clean handoff so nothing gets lost in translation.

Packaged by TGB · To Bajada sticker vendor
Open
Phase B · Capture and automation
3

GHL lead capture

iPad form, lead routing and a five-email post-fair automation. Every visitor who scans or signs up is captured, tagged and followed up automatically.

Built and managed by TGB
Open
Phase C · Build and on-site
5

In-house assembly team brief

Layout brief and walkthrough for the Bajada build team, so the stand goes up exactly as designed.

Brief by TGB · Built by Bajada assembly team
Open
6

Day-0 dry run and final walkthrough

On-site check at MFCC before doors open. Everything tested, the iPad capture live, signage correct, nothing left to chance.

TGB on-site · Coordination Allyson
Open
7

Install-week and fair-week support

Support on hand through install and across the fair. Fast fixes and on-the-spot tweaks as they come up.

Support by TGB
Open
Phase D · Amplify and wrap
8

Fair-week social grid repurpose

Stand content turned into a social grid running 24 June to 4 July. The fair keeps working on the feed after the doors close.

Produced and scheduled by TGB
Open
9

Post-fair wrap

Lead report plus a clean handover to the Bajada sales team. Every captured lead, tagged and ready to work.

Compiled by TGB · Handover to Bajada sales
Open
04 / The path to the floor

From kickoff to lead report

The sequence that gets us from today to a stand full of booked leads. Design locks first, build follows, the fair runs, and the leads land in sales.

Thu 4 JuneAlignment callScope confirmed, stand layout decision on the table.
Week of 9 JuneDesign and print artworkChosen layout drives fascia, back wall, flags, partitions and the Water Pro zone. Files packaged for the vendor.
Week of 16 JuneCapture build and assembly briefGHL iPad form, routing and the five-email automation built and tested. Assembly team briefed.
Install weekStand build and Day-0 dry runStand goes up at MFCC. Final walkthrough, capture tested live, support on hand.
Tue 24 JuneFair Day 1Doors open. Water Pro front and centre, leads captured on the iPad, support on hand through the week.
24 June to 4 JulySocial grid liveStand content repurposed into a running social grid across the fair window.
After the fairWrap and handoverLead report compiled, every lead handed to Bajada sales ready to work.
05 / Who does what

Clear owners, no gaps

TGB

Your delivery team

  • Client lead single point of contact and final approvals
  • Creative direction stand design, social, and GHL build
  • Production and routing asset handoff, print specs, file delivery
  • On-site support install week and across the fair
Bajada side

Your team and partners

  • Daniel Group CEO, final sign-off
  • Antoine commercial liaison, day to day
  • Allyson day-of-fair coordination
  • Sticker vendor vinyl print and install (Bajada-managed)
  • Assembly team in-house stand build
06 / How we keep it clean

What is in, and what is not

The nine workstreams above are the full scope of the engagement. To keep timelines tight and the work moving, revisions are bounded.

Two revision rounds per deliverable are included. Anything beyond that is happily done and billed at standard rate. This keeps the design path fast and protects the fair deadline.
07 / Everything in one place

The full resource set

Every document behind this campaign, ready to open.